Client: BDX Företagen AB
Location: Vibbyn
Period: 2013-07-15–
About the project
Description
Due to very poor ground conditions a temporary by-pass sank into the clay and the need for a temporary bridge with longer span was imminent. The bridge was launched sideways du to the limited size of cranes that could be used.
Our mission
Rental, erection and dismantling
Facts
Span: 34m
Width: 7.0m
Loading: Bk 1