Client: Asfaltbeläggningar i Boden ABLocation: SvappavaaraPeriod: sept-okt 2014 About the project DescriptionTemporary detour for traffic on the E10 in order to widen and reinforce existing bridge over. The bridge was to take 90 ton mining vehicles and to be designed...
by Nordbro | Apr 13, 2021 | Completed 🔴
Client: Longyearbyen LokalstyreLocation: Longyearbyen, SvalbardPeriod: 2014 About the project DescriptionDue to floods in the summer of 2013, the bridge on Museumsveien was washed away. The decision was made to replace the bridge with a single lane modular bridge...
by Nordbro | Apr 13, 2021 | Completed 🔴
Client: Statens VegvesenLocation: Porsgrunn, NorgePeriod: 2013 About the project DescriptionTwo lane Unibridge in one clear span with a cantilever footwalk Our missionSupply of bridge equipment. Technical assistance. FactsSpan: 46.4mWidth: 8.0mLoading: BK 10/60 More...
by Nordbro | Apr 13, 2021 | Completed 🔴
Client: BDX Företagen ABLocation: VibbynPeriod: 2013-07-15– About the project DescriptionDue to very poor ground conditions a temporary by-pass sank into the clay and the need for a temporary bridge with longer span was imminent. The bridge was launched sideways...
by Nordbro | Apr 13, 2021 | Completed 🔴
Client: SkanskaLocation: Vuottasjokk, Lappberg stationPeriod: 2012– About the project DescriptionSingle lane bridge in one span Our missionPlanning and erection. FactsSpan: 30mWidth: 4.20mLoading: Exceptional loads More picture from the...
by Nordbro | Apr 13, 2021 | Completed 🔴
Client: PeabLocation: Gullåkra, StaffanstorpPeriod: February 2013–April 2013 About the project DescriptionSingle lane bridge in one span Our missionPlanning, erection and rental of equipment FactsSpan: 16mWidth: 3.45mLoading: Bk 1 More picture from the...