Customer: NCC/Falun Municipality
Location: Masugnen, Falun
Period: April 2024
About the project
Description
Permanent bridge of the Unibridge type for two lanes. The roadway was paved with asphalt.
Our mission
Delivery of bridge equipment
Project management
Complete assembly
Facts
Bridge length: 24.4 m
Width: 6.7 m
Traffic load: BK1