Customer: NCC/Falun Municipality
Location: Masugnen, Falun
Period: April 2024

About the project

Description
Permanent bridge of the Unibridge type for two lanes. The roadway was paved with asphalt.

Our mission
Delivery of bridge equipment
Project management
Complete assembly

Facts
Bridge length: 24.4 m
Width: 6.7 m
Traffic load: BK1

More picture from the project