Client: Bilfinger Berger Ingenieurbau GmbH
Location: Norrtull – Stockholm
Period: 2009 – 2011
About the project
Description
Two bridges, double lane and triple lane
Our mission
Rental of equipment, erection and dismantling.
Facts
Span: 54 and 56m respectively
Width: 7,35 and 7,35 + 3 m footwalk respectively
Loading: Bk 1