Client: Longyearbyen Lokalstyre
Location: Longyearbyen, Svalbard
Period: 2014

About the project

Description
Due to floods in the summer of 2013, the bridge on Museumsveien was washed away. The decision was made to replace the bridge with a single lane modular bridge where the Unibridge system was choosen.

Our mission
Supply of bridge equipment. Technical assistance.

Facts
Span: 40.3m
Width: 4.0m + 1.2m footwalk
Loading: BK 10/60, 80 years fatigue life

More picture from the project