Client: Asfaltbeläggningar i Boden AB
Location: Svappavaara
Period: sept-okt 2014

About the project

Description
Temporary detour for traffic on the E10 in order to widen and reinforce existing bridge over. The bridge was to take 90 ton mining vehicles and to be designed to the EC loadings.

Our mission
Rent, bearing capacity survey, erection and dismantling.

Facts
Span: 34m
Width: 4m
Loading: A/B=180/210 kN to Swedish Code

More picture from the project