Client: Trafikverket
Location: Skateholm
Period: 2013-03–
About the project
Description
Due to settlements in the ballast wall a quick solution was needed to avoid road closure. The answer was a quickly assembled overbridge with ramps on top of the existing structure.
Our mission
Planning, erection and rental of equipment
Facts
Span: 12m
Width: 3.45m
Loading: Bk 1